Asbestos removal in Saint-Denis in Reunion
VALGO in Reunion: a major project is completed in the heart of Saint-Denis!
VALGO in Reunion: a major project is completed in the heart of Saint-Denis!
In order to remove asbestos from the former Sainte-Catherine clinic, VALGO integrated innovative technical solutions guaranteeing the safety of teams and the public while meeting demanding deadlines.
Valgo and our Asbestos Removal division were mobilized for a major project: cleaning and asbestos removal before demolition of the former headquarters of the Lille Metropolis to create a new dynamic urban area.
A new innovation from VALGO: the simultaneous association of 2 purification and sediment treatment techniques.
Our teams will take you to Brittany, to the Island of Ouessant for asbestos removal where adaptation and logistics were the key words of this operation.
As part of the technical shutdown of the Albioma thermal power plant in Saint-André (Reunion Island), VALGO was in charge of dismantling and removing asbestos from the flue gas treatment ducts.
Valorisation of a former oil depot that belonged to Shell and then to Lyondellbasell. The 21,000 m² site, surrounded by the Nationale 7 (trunk road) and a railway line, is crossed by a hydrocarbon distribution pipe to create an easement.
Lead removal at the famous passage Jouffroy located in the 9th arrondissement of Paris at the Grands Boulevards
Cleaning of leaded materials in the context of the rehabilitation of the City Hall
Complete rehabilitation of a classified monument in the presence of asbestos and lead
Programmed intervention for the modernization of HCL buildings
Intervention during school holidays for the modernization of teaching premises
Restructuring and rehabilitation of an old medical building at the heart of the city
Complete redevelopment of boulevards in the city center of Grenoble
Asbestos removal in an occupied environment for 4 years
Demolition and asbestos removal of several residential and commercial buildings in urban areas
Asbestos removal in a busy environment as the shopping center is rehabilitated
Site preparation, implementation, implementation and monitoring of the site except the specificities related to the treatment technique
Excavation of polluted soil
Pumping treatment and skimming
Treatment of groundwater polluted with chlorinated solvents - ISCR technique (chemical reduction)
On-site thermal desorption of COHV, HCT and PCB grounds
Remediation of the site for industrial use
Highly constrained planning site as part of the restructuring of the area
VALGO’s expertise in asbestos and lead removal and soil remediation operations is enhanced by each new project carried out by its engineers and operators, throughout France and the world.
Each case of pollution (asbestos or other pollutants) is unique because of the nature of the pollutant, the depth at which it is located, the nature of the soil, or the presence – or not – of residencial or activity areas near the site. To meet these multiple challenges, VALGO puts its depollution experience and skills at the service of its clients.
For this purpose, VALGO collects all the data from its sites, which we add to our database that includes more than 1,000 soil remediation sites, in order to respond more accurately to soil pollution problems or asbestos contaminated constructions.
Our teams work on depollution sites as well as asbestos and removal sites in a wide variety of environments: service stations, industrial and urban wastelands, factories in operation or in cessation of activity, public buildings (schools, university hospitals, universities) and historic buildings.